default search action
Journal of Scheduling, Volume 18
Volume 18, Number 1, February 2015
- Edmund K. Burke

, Michael L. Pinedo:
Journal of Scheduling (2015). 1 - Sorina Dumitrescu, George Steiner, Rui Zhang:

Optimal delivery time quotation in supply chains to minimize tardiness and delivery costs. 3-13 - Alessandro Agnetis

, Cyril Briand
, Jean-Charles Billaut, Premysl Sucha:
Nash equilibria for the multi-agent project scheduling problem with controllable processing times. 15-27 - Egbert van der Veen, Erwin W. Hans

, Gerhard F. Post, Bart Veltman:
Shift rostering using decomposition: assign weekend shifts first. 29-43 - Jelle Duives, Birgit Heydenreich, Debasis Mishra, Rudolf Müller, Marc Uetz:

On optimal mechanism design for a sequencing problem. 45-59 - Tony Wauters

, Katja Verbeeck, Patrick De Causmaecker
, Greet Vanden Berghe:
A learning-based optimization approach to multi-project scheduling. 61-74 - Dvir Shabtay

, Shlomo Karhi, Daniel Oron:
Multipurpose machine scheduling with rejection and identical job processing times. 75-88 - Simon Thevenin, Nicolas Zufferey, Marino Widmer

:
Metaheuristics for a scheduling problem with rejection and tardiness penalties. 89-105 - Benjamin Moseley:

Scheduling to minimize energy and flow time in broadcast scheduling. 107-118 
Volume 18, Number 2, April 2015
- Frans Schalekamp, René Sitters, Suzanne van der Ster, Leen Stougie, Víctor Verdugo

, Anke van Zuylen:
Split scheduling with uniform setup times. 119-129 - Alewyn P. Burger, C. G. Jacobs, Jan H. van Vuuren

, Stephan Esterhuyse Visagie
:
Scheduling multi-colour print jobs with sequence-dependent setup times. 131-145 - Jinjiang Yuan, C. T. Ng

, T. C. Edwin Cheng
:
Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness. 147-153 - Edward G. Coffman Jr., C. T. Ng

, Vadim G. Timkovsky:
How small are shifts required in optimal preemptive schedules? 155-163 - Troels Martin Range

, Richard Martin Lusby
, Jesper Larsen
:
Solving the selective multi-category parallel-servicing problem. 165-184 - Tianping Shuai, Donglei Du

, Xiaoyue Jiang:
On-line preemptive machine scheduling with ℓp norm on two uniform machines. 185-194 - Claude Yugma, Jakey Blue, Stéphane Dauzère-Pérès

, Ali Obeid:
Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook. 195-205 - Sana Dahmen, Monia Rekik

:
Solving multi-activity multi-day shift scheduling problems with a hybrid heuristic. 207-223 
Volume 18, Number 3, June 2015
- Christian Artigues, Pierre Lopez:

Energetic reasoning for energy-constrained scheduling with a continuous resource. 225-241 - Alessandro Agnetis

, Gaia Nicosia
, Andrea Pacifici
, Ulrich Pferschy:
Scheduling two agent task chains with a central selection mechanism. 243-261 - Stefan Creemers

:
Minimizing the expected makespan of a project with stochastic activity durations under resource constraints. 263-273 - Zdenek Hanzálek

, Claire Hanen:
The impact of core precedences in a cyclic RCPSP with precedence delays. 275-284 - Jian-Jun Qi, Yajie Liu, Ping Jiang, Bo Guo:

Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization. 285-298 - Odile Bellenguez-Morineau

, Marek Chrobak, Christoph Dürr, Damien Prot:
A note on NP-hardness of preemptive mean flow-time scheduling for parallel machines. 299-304 - Kenneth R. Baker, Dan Trietsch:

Trading off due-date tightness and job tardiness in a basic scheduling model. 305-309 - Alan J. Soper

:
A cyclical search for the two machine flow shop and open shop to minimise finishing time. 311-314 - Long Wan, Jinjiang Yuan, Zhichao Geng:

A note on the preemptive scheduling to minimize total completion time with release time and deadline constraints. 315-323 - James D. Blocher, Sergey Sevastyanov

:
A note on the Coffman-Sethi bound for LPT scheduling. 325-327 - Dvir Shabtay

, Nufar Gaspar, Moshe Kaspi
:
Erratum to: A survey on offline scheduling with rejection. 329 - Jaehwan Yang, Marc E. Posner:

Erratum to: Flow shops with WIP and value added costs. 331 
Volume 18, Number 4, August 2015
- Jacek Blazewicz

, Erwin Pesch, Denis Trystram, Guochuan Zhang
:
New perspectives in scheduling theory. 333-334 - Yann Hendel, Wieslaw Kubiak, Denis Trystram:

Scheduling semi-malleable jobs to minimize mean flow time. 335-343 - Piotr Switalski

, Franciszek Seredynski
:
Scheduling parallel batch jobs in grids with evolutionary metaheuristics. 345-357 - Xiandong Zhang

, Steef L. van de Velde:
Two-machine interval shop scheduling with time lags. 359-368 - Luke Muggy, Todd Easton

:
Generating class schedules within a complex modular environment with application to secondary schools. 369-376 - Simon Kristiansen, Matias Sørensen, Thomas R. Stidsen

:
Integer programming for the generalized high school timetabling problem. 377-392 - Nathaniel Kell, Jessen T. Havill

:
Improved upper bounds for online malleable job scheduling. 393-410 - Weiya Zhong, Zhi-Long Chen:

Flowshop scheduling with interstage job transportation. 411-422 - Mikhail Y. Kovalyov

, Ammar Oulamara, Ameur Soukhal:
Two-agent scheduling with agent specific batches on an unbounded serial batching machine. 423-434 
Volume 18, Number 5, October 2015
- Fabio Furini

, Martin Philip Kidd
, Carlo Alfredo Persiani, Paolo Toth:
Improved rolling horizon approaches to the aircraft sequencing problem. 435-447 - René van Bevern, Matthias Mnich

, Rolf Niedermeier, Mathias Weller:
Interval scheduling and colorful independent sets. 449-469 - Maliheh Aramon Bajestani, J. Christopher Beck:

A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines. 471-486 - Iwo Bladek

, Maciej Drozdowski
, Frédéric Guinand
, Xavier Schepler:
On contiguous and non-contiguous parallel task scheduling. 487-495 - Behzad Hezarkhani

, Wieslaw Kubiak:
Decentralized subcontractor scheduling with divisible jobs. 497-511 - Yossef Luzon, Yariv N. Marmor

, Eugene Khmelnitsky:
Optimal control of a two-server flow-shop network. 513-524 - Davide Giglio

:
Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times. 525-543 
Volume 18, Number 6, December 2015
- Marcin Bienkowski

, Jaroslaw Byrka, Marek Chrobak, Neil B. Dobbs, Tomasz Nowicki, Maxim Sviridenko, Grzegorz Swirszcz, Neal E. Young
:
Approximation algorithms for the joint replenishment problem with deadlines. 545-560 - Rohit Khandekar, Baruch Schieber, Hadas Shachnai, Tami Tamir:

Real-time scheduling to minimize machine busy times. 561-573 - Bita Tadayon, J. Cole Smith

:
Algorithms and Complexity Analysis for Robust Single-Machine Scheduling Problems. 575-592 - Arne Mensendiek:

Scheduling with returnable containers. 593-605 - Na Fu, Hoong Chuin Lau

, Pradeep Varakantham
:
Robust execution strategies for project scheduling with unreliable resources and stochastic durations. 607-622 - Hans Kellerer, Vladimir Kotov

, Michaël Gabay
:
An efficient algorithm for semi-online multiprocessor scheduling with given total processing time. 623-630 - Vassilissa Lehoux-Lebacque

, Nadia Brauner
, Gerd Finke:
Identical coupled task scheduling: polynomial complexity of the cyclic case. 631-644 - Ehab Morsy

, Erwin Pesch:
Approximation algorithms for inventory constrained scheduling on a single machine. 645-653 

manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.


Google
Google Scholar
Semantic Scholar
Internet Archive Scholar
CiteSeerX
ORCID